Test room design
Endothermic motors
Tecno EL not only produces equipment and software, but can also design
and
build a turnkey motor test rooms to meet every requirement.
Our Technical Department will see to all stages of the design, including:
-
Sound-proof cabin and masonry work
-
Hydraulic system
-
Mechanics
-
Acquisition electronics
-
Electrical system and primary and secondary lighting system inside and
outside the room
-
Ventilation system
-
Control of cooling tower, cooling pumps, heat exchangers
-
Accessories inside and outside the test room
The image below shows a typical example of a turnkey endothermic motor
test
stand designed and built by Tecno EL.
The electronic equipment, including:
-
Interfaces
-
PC
-
Consumption meter
-
Safeties rack
-
Brake feeder
-
Actuator
-
Start-up rack
-
and others….
are housed in a rack cabinet positioned outside the test room.
On the desk under the window in the room or in the immediate vicinity
sit the following:
-
Monitor, keyboard and mouse
-
Printer
-
Console for remote controls
All controls for equipment outside and inside the room, including
-
Ventilation system
-
Exhaust intake system
-
Lifting system
-
50/60 Hz frequency converter with manual and automatic controls
-
Primary and secondary lighting system
-
Control of primary and secondary electrical utilities
-
Fire prevention system
-
Brake water and engine water cooling pumps
-
Fuel pumps
-
Cooling tower circulation pumps
-
Thermoregulation system
are housed in a second cabinet containing signal lamps and control
buttons that makes for excellent user interface.
In the test rooms pictured you can note some of the features described.
In the close-up above, you can see the brake and its accessories.
The brake was supplied by a leading company in the field and
valuable partner of Tecno EL that has vast experience in designing
motor test
rooms in and outside of Italy. Tecno EL can supply
the brake, actuator and related control devices, in addition to performing
the wiring
and interfacing with the acquisition equipment.
The room's electrical system and wiring layout are carried out in conformity
with the
most recent EEC standards, and are the result our 15-year experience
in the field.
Runners and ducts are built in metal, and are aesthetically pleasing
and functional
at the same time.The hydraulic and fuel systems have been designed
with care, and
pipes are positioned so that they won't interfere with work.
Note, also, how the hoist and exhaust intake system have been positioned
intelligently.
Pictured are the CO cylinders positioned outside the test room.
They are part of a fire prevention system that features:
-
Sprinkler system in the room designed to saturate the environment completely.
-
Signalling system in room
-
Fire detector
-
Electronic control unit located outside room
-
Group of 3 CO cylinders complete with valves
The electrical box for the fire prevention system
The photo below shows an example of a cooling tower that Tecno EL
supplies with
its motor test rooms.
Because they know maximum power of the motors being tested, our technicians
can calculate the size of the tower, the pumps and pipes need to build
the entire system.
For the cooling system to operate efficiently, Tecno EL offers
the following accessories:
-
unit of solenoid valves for controlling water
-
water pump unit, comprising:
-
tank filling pump
-
motor water pump
-
cooling tower water circulation pump
-
water treatment system, comprising:
-
dispensing pump
-
product management box
-
container of chemical product for water treatment
after analysis of water used in order to determine correct quantity
and type of product to use.
The photo below shows another example of a motor test room we set up at
a
company that wanted to renovate an old room in disuse.
As you can see, even when modernized, the result is extremely functional.
| INFORMATION |
PRODUCTION |
NEWS! |
OCCASIONS! |
SERVICES |
| HOME PAGE |